* Up to Main
Annual Facilities Permit
How the Program Works
How to Qualify
How To Apply
AFP Registration Packet

Qualifying To Participate In The AFP Program

To qualify as a participant in the Annual Facilities Permit Program the facility must be a firm, corporation or political entity engaged in manufacturing, processing or service which occupies and controls specialized buildings and building service equipment to the extent that full time personnel are required to manage, operate or maintain such buildings and equipment in compliance with all provisions of the Phoenix Construction Code. An engineer or architect registered and residing in the State of Arizona must be responsible for complying with the substantive provisions of the Phoenix Construction Code and is considered the agent for the facility. The agent, as authorized by rules established by the Arizona Board of Technical Registration, must assure work has been performed in accordance with the Phoenix Construction Code.

Examples Of Facilities Participating In The AFP Program

An example of a few facilities that have participated in the program include:

American Express Honeywell Phoenix Heat Treating
Ameron Pipe Holsum Bakery Phoenix Newspaper
A.P.S.- Pinnacle West Karsten Manufacturing Samaritan Health Services
Bank One Mayo Clinic Scottsdale School District
Chase Field Motorola Sonee Heat Treating
City of Phoenix Aviation ON Semiconductor St. Joseph’s Hospital
City of Phoenix Metro-Facilities Park Central Thornwood Manufacturing
City of Phoenix Public Works Penn Atheletic Grand Canyon University
Pepsi-Cola U.S. West Sanmina
Phoenix Children’s Hospital VAW of America Washington Elementary School District

The size of the facilities range from a few thousand square feet to several million square feet.



Last modified on 10/31/2008 09:04:07